Design and installation of a 10KW solar system in General Hospital, Igbokoda

Location

Ondo State

Date

August 2022

Products used for this project

Battery, Solar panel, GroWatt Inverter

Description:

SAO-Energy in partnership with World Bank has continued to support Ondo State General Hospitals by electrifying another three general hospitals through the installation of hybrid 30kw solar systems with storage. 

Among these hospitals is Igbokoda General Hospital located in the Igbokoda Southern senatorial district of Ondo State which benefitted from this electrification in 2022.

This has reduced the downtime for medical equipment such as ventilators, incubators, suction units and dialysis machines, which in turn will have an impact on the well-being of Ondo citizens, and more importantly, help to save lives.

Igbokoda General Hospital can now boast of a 24-hour power supply, a feat which elicited excitement from members of the community who had been affected negatively by the lack of electricity in the past. 

Products used for this project: 10Kva solar inverters, 32 panels, charge controllers, 16 batteries, plus 30 solar poles.